Drolet HT-2000 Spezifikationen

Stöbern Sie online oder laden Sie Spezifikationen nach Öfen Drolet HT-2000 herunter. Drolet HT-2000 Specifications Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 55
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
READ AND KEEP THIS MANUAL FOR REFERENCE
45060A
Printed in Canada 18-08-2014
Installation and Operation Manual
HT-2000
US ENVIRONMENTAL PROTECTION
AGENCY PHASE II CERTIFIED
WOOD STOVE
Safety tested according to ULC S627,
and UL 1482 Standards
by Intertek Testing Services
www.drolet.ca
Stove Builder International Inc.
250, rue de Copenhague, St-Augustin-de-Desmaures
(Quebec) Canada G3A 2H3
Tel: (418) 878-3040 Fax: (418) 878-3001
This manual is available for free download on the manufacturer’s web site. It is a
copyrighted document. Re-sale is strictly prohibited. The manufacturer may update this
manual from time to time and cannot be responsible for problems, injuries, or damages
arising out of the use of information contained in any manual obtained from unauthorized
sources.
Seitenansicht 0
1 2 3 4 5 6 ... 54 55

Inhaltsverzeichnis

Seite 1 - HT-2000

READ AND KEEP THIS MANUAL FOR REFERENCE 45060A Printed in Canada 18-08-2014 Installation and Operation Manual HT-2000 US ENVIRONMENTAL PROTECTIO

Seite 2

HT-2000 Installation and Operation Manual 10 2.2 Zone Heating and How to Make it Work for You Your new HT-2000 wood stove is a space heater, whic

Seite 3 - Table of content

HT-2000 Installation and Operation Manual 11 2.4 The SBI Commitment to You and the Environment The SBI team is committed to protecting the enviro

Seite 4

HT-2000 Installation and Operation Manual 12 3 Fuel 3.1 Materials That Should Not be Burned  GARBAGE OF ANY KIND,  COAL OR CHARCOAL,  TREA

Seite 5

HT-2000 Installation and Operation Manual 13 wouldn’t hold a fire overnight unless they were fed large pieces of hardwood. That is no longer true.

Seite 6 - 2 Safety Information

HT-2000 Installation and Operation Manual 14 Wood should be split to a range of sizes, from about 3” to 6” (75 mm to 150 mm) in cross section. Hav

Seite 7 - 2 General Information

HT-2000 Installation and Operation Manual 15 3.2.6 Judging Firewood Moisture Content You can find out if some firewood is dry enough to burn by u

Seite 8

HT-2000 Installation and Operation Manual 16 4 Operating Your Stove 4.1 Your First Fires Two things will happen as you burn your first few fire

Seite 9

HT-2000 Installation and Operation Manual 17 DO NOT LEAVE THE STOVE UNATTENDED WHEN THE DOOR IS SLIGHTLY OPENED DURING IGNITION. ALWAYS CLOSE THE

Seite 10

HT-2000 Installation and Operation Manual 18 in temperature throughout the day and night. This is normal, and for experienced wood burners these a

Seite 11

HT-2000 Installation and Operation Manual 19 4.3.3 Raking Charcoal Rekindle the fire when you notice that the room temperature has fallen. You wil

Seite 12

HT-2000 Installation and Operation Manual 2 THANK YOU FOR CHOOSING THIS DROLET WOOD STOVE As one of North America’s largest and most respected wo

Seite 13

HT-2000 Installation and Operation Manual 20 4.3.5 Turning Down the Air Supply Once the firewood, firebox and chimney are hot, you can begin to

Seite 14

HT-2000 Installation and Operation Manual 21 4.3.6 Building Different Fires for Different Needs Using the air control is not the only way to matc

Seite 15 - 3.3 Manufactured Logs

HT-2000 Installation and Operation Manual 22 4.3.6.4 Maximum Burn Cycle Times The burn cycle time is the period between loading wood on a coal be

Seite 16 - 4 Operating Your Stove

HT-2000 Installation and Operation Manual 23 5 Maintaining Your Wood Heating System 5.1 Stove Maintenance Your new stove will give many years of

Seite 17 - 4.3 Maintaining Wood Fires

HT-2000 Installation and Operation Manual 24 5.1.3 Door adjustment In order for your stove to burn at its best efficiency, the door must provide a

Seite 18

HT-2000 Installation and Operation Manual 25 5.1.4 Replacing the Door Gasket It is important to maintain the gasket in good condition. After a ye

Seite 19

HT-2000 Installation and Operation Manual 26 The gasket must be centred on the edge of the glass. To do this easily, peel back a section of the pa

Seite 20

HT-2000 Installation and Operation Manual 27 more slowly. Your new stove has the right characteristics to help you to burn clean fires with little

Seite 21

HT-2000 Installation and Operation Manual 28 PART B - INSTALLATION 6 Safety Information 6.1 Summary of Installation Cautions and Warnings • THE I

Seite 22

HT-2000 Installation and Operation Manual 29 6.2 Regulations Covering Stove Installation When installed and operated as described in these instru

Seite 23 - 5.1 Stove Maintenance

HT-2000 Installation and Operation Manual 3 Table of content PART A - OPERATION AND MAINTENANCE ... 62 Safety Inform

Seite 24

HT-2000 Installation and Operation Manual 30 7 Clearances to Combustible Material The clearances shown in this section have been determined by te

Seite 25

HT-2000 Installation and Operation Manual 31    Clearances to combustible materials and floor protection

Seite 26

HT-2000 Installation and Operation Manual 32 7.3 Floor protector Your stove has been conceived to prevent the floor from overheating. However, it

Seite 27

HT-2000 Installation and Operation Manual 33 7.4 Reducing Wall and Ceiling Clearances Safely It is often desirable to reduce the minimum installa

Seite 28 - 6 Safety Information

HT-2000 Installation and Operation Manual 34 Clearances for shield construction

Seite 29

HT-2000 Installation and Operation Manual 35 7.4.2 Table of Clearance Reduction Percentages Type of shield Clearances may be reduced by these per

Seite 30

HT-2000 Installation and Operation Manual 36 8 The Venting System 8.1 General The venting system, made up of the chimney and the connecting pipe

Seite 31 -

HT-2000 Installation and Operation Manual 37 To be suitable, a factory-built metal chimney must comply with UL 103 HT (U.S.A.) or ULC S629 (Canada

Seite 32 - 7.3 Floor protector

HT-2000 Installation and Operation Manual 38 8.2.2 Masonry Chimneys The stove may also be connected to a masonry chimney, provided the chimney com

Seite 33

HT-2000 Installation and Operation Manual 39 8.4 The Relationship Between the Chimney and the House Because the venting system is the engine that

Seite 34

HT-2000 Installation and Operation Manual 4 5 Maintaining Your Wood Heating System ... 235.1 Stove Maintenance ...

Seite 35

HT-2000 Installation and Operation Manual 40 8.4.2 Why the chimney should penetrate the highest heated space When it is cold outside, the warm ai

Seite 36 - 8 The Venting System

HT-2000 Installation and Operation Manual 41 Some jurisdictions in the United States require that wood stoves have a supply of combustion air from

Seite 37

HT-2000 Installation and Operation Manual 42 8.6.1 Installation of Single Wall Chimney Connector The chimney connector assembly has been called ‘

Seite 38 - 8.3 Minimum Chimney Height

HT-2000 Installation and Operation Manual 43 The rules below are based on those found in the CSA B365 installation code. Please carefully follow t

Seite 39

HT-2000 Installation and Operation Manual 44 Appendix 1: Installing the Pedestal The pedestal kit must be assembled to the firebox before position

Seite 40

HT-2000 Installation and Operation Manual 45 Appendix 2: Installing Trims Your freestanding Drolet wood stove is equipped with decorative u-shaped

Seite 41

HT-2000 Installation and Operation Manual 46 3- Press the ashtray trim (F) on the upper edge of ashtray lip.

Seite 42

HT-2000 Installation and Operation Manual 47 Appendix 3: Installation and Use of Optional Air Circulation Fan (AC02050), and Thermodiscs (AC02055

Seite 43

HT-2000 Installation and Operation Manual 48 When using the optional fan, allow the stove to reach operating temperature (approximately one hour),

Seite 44

HT-2000 Installation and Operation Manual 49 Appendix 4: Installation of Secondary Air Tubes 1-Starting with the rear tube, lean and insert the r

Seite 45 - Appendix 2: Installing Trims

HT-2000 Installation and Operation Manual 5 8.6 Installing the Chimney Connector ...

Seite 46

HT-2000 Installation and Operation Manual 50 Appendix 5: Baffle Installation 1- Remove the front secondary air tube (A) and its cotter pin (B

Seite 47

HT-2000 Installation and Operation Manual 51 Note that secondary air tubes can be replaced without removing the baffle board. Important Notes:

Seite 48

HT-2000 Installation and Operation Manual 52 Appendix 6: Exploded Diagram and Parts List

Seite 49

HT-2000 Installation and Operation Manual 53 IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement parts for your stove, pl

Seite 50

HT-2000 Installation and Operation Manual 54 # Item Description Qty 33 30075 BRASS METAL SCREW #6 X 1/2" QUADREX 4 33 30142 NICKEL ME

Seite 51 - Model Type of tube

HT-2000 Installation and Operation Manual 55 DROLET LIMITED LIFETIME WARRANTY The warranty of the manufacturer extends only to the original consum

Seite 52

HT-2000 Installation and Operation Manual 6 PART A - OPERATION AND MAINTENANCE Please see Part B for installation instructions. 2 Safety Informati

Seite 53

HT-2000 Installation and Operation Manual 7 2 General Information 2.1 HT-2000 Specifications Fuel Type Cordwood Test Standards (safety) ULC

Seite 54

HT-2000 Installation and Operation Manual 8

Seite 55

HT-2000 Installation and Operation Manual 9

Kommentare zu diesen Handbüchern

Keine Kommentare